MATERIAL HANDLING AND SOLIDIFICATION / STABILIZATION FACILITIES

  • 01 Ocak 2012

The scope of work: 
Preparing the application projects and technical specifications for the construction and operation of industrial handling and solidification / stabilization facilities to be established in Sile-Komurcuoda and planning of roads within the facility

  • Preparation of electrical, mechanical, architectural and structural application projects
  • Preparation of water, wastewater and infrastructure projects,
  • All project and process calculations
  • Preparation of estimate, BOQ and percentage calculations for each unit of the project
  • Preparation of specifications covering each material, manufacturing, tools, and equipment used in the projects
  • Preparation of general technical specifications for work execution.

Place:  Sile-Komurcuoda    
Customer: Istac Inc.
Work completion date: 2012
 

Other Projects


MALDIVES LEACHATE AND WASTEWATER  TREATMENT PLANT 2023

MALDIVES LEACHATE AND WASTEWATER…

Provision of consultancy services during the design of 90 m³/day leachate and wastewater treatment in…
IVEDIK POTABLE WASTE TREATMENT PLANT 2020

IVEDIK POTABLE WASTE TREATMENT PLANT…

Potable waste treatment plant project
AGDAM AZERBAIJAN WASTEWATER TREATMENT PLANT

AGDAM AZERBAIJAN WASTEWATER TREATMENT…

Design of the Agdam wastewater treatment plant for 30.000 m³/day , preparation of construction (reinforced…
KASTAMONU LEACHATE TREATMENT PLANT (EU FUNDED) 2021

KASTAMONU LEACHATE TREATMENT PLANT…

Provision of consultancy services during the design of 120 m³/day leachate treatment plant from the…