IVEDIK POTABLE WASTE TREATMENT PLANT 2020
IVEDIK POTABLE WASTE TREATMENT PLANT 2020
- 30 Aralık 2023
Scope of Work:
The project will provide 750.000 m³/day water to Ankara.
- Hydraulic modelling
- Preparation of architectural, static and concrete implementation and detail projects
- Preparation of electrical, mechanical and piping projects.
- Preparation of Bill of Quantities
- Preparation of Technical Specification
- Preparation of Terms of Reference (TOR)
- Preparation of Tender Dossier for Supply Tender
The Project consists of:
- Prestressed reinforced concrete pipe or steel pipes of various diameters (Diameter: 2200 mm)
- 750 000 m³/day capacity Treatment Plant
- Water Tanks in various sizes