KASTAMONU LEACHATE TREATMENT PLANT (EU FUNDED) 2021
KASTAMONU LEACHATE TREATMENT PLANT (EU FUNDED) 2021
- 30 Aralık 2023
Scope of Work:
Provision of consultancy services during the design of 120 m³/day leachate treatment plant from the Kastamonu landfill, approvals from the Ministry of Environment and Urbanization and, preparation of construction (reinforced concrete and static), architectural, mechanical, electrical, road, infrastructure, drainage and landscaping application projects.
Treatment Plant Units
Preliminary Treatment
Drum Screen
Pumping Station
Biological Treatment
Anaerobic Pool
Biological Nitrogen and Carbon Removal (Simultaneous Denitrification)
Ultrafiltration (UF)
Nanofiltration (NF)
CIP Unit
Sludge Treatment
Sludge Dewatering with Centrifuge