BURSA METROPOLITAN MUNICIPALITY SHIP WASTE ACCEPTANCE PLANT
BURSA METROPOLITAN MUNICIPALITY SHIP WASTE ACCEPTANCE PLANT
- 01 Mart 2019
The scope of work:
The preparation of the feasibility report and projects of the Ship Waste Acceptance Facility planned to be made in Bursa. Preparation of waste management plan, architectural, mechanical, electrical and structural projects, estimate, BOQ, and specifications
Location: Bursa
Customer: ISTAC
Work completion date:Ongoing.
Some of Our Other References
- Preparation of Construction-Demolition Waste and Excavation Management Plans, 2012
- Transformation of Air Quality Data Measured in 11 different regions in Istanbul into Index Values and preparation of Daily Air Quality Estimates, 2012
- Halic Project Investigation of the Current Pollution Level, 2012
- Nigde Akkaya Dam Reservoir and Environment treatment Project, 2012
- Problems and Suggestions for Solving the problems in Tuzla Biological and Advanced Biological Wastewater Treatment Plant Facility caused by Shipyard Waste Water Discharged Directly to ISKI (Istanbul Water and Sewerage Administration) Sewerage System, OSB (Organized Industrial Zone) Wastewater, Hazardous Waste Water and Hazardous Liquid Wastes in the Region, İSKİ, 2012
- Bottom Mud Screening and Moving of the bottom mud in the horizontal direction in Golden Horn Stream entrance project, 2013
- Condensation and Dewatering of Bottom Mud to be Screened at the Golden Horn and Stream Entrances Project, 2013
- Gebze Komurculer OSB (Organized Industrial Zone) Treatment project for Sewage and Rainwater containing coal dust, 2013
- Istac Incorporated Company, a feasibility study for industrial waste incineration plant and determination of an alternative site, 2015.
- GIS, Greenhouse Gas Emission Inventory Study, 2015.
- EBRD, Biomass Power Plant Technical Advisory Service, 2015.
- Taseli Municipality Solid Waste Disposal Site Preparation of Construction Drawings and Tender Documents, 2015.
- Polyplex Wastewater Treatment Plant Project Preparation and Receipt of Project Approval, 2016
- Preparing Construction Drawings and documents required for the bidding for T.R. Trabzon and Rize Solid Waste Regular Storage Facility Required for Lot Construction, 2016
- T.C. Ordu Metropolitan Municipality "Preparation of Feasibility Report for Ordinary Solid Waste Landfill and Disposal Facilities", 2016