The scope of work: 
Preparing the application projects and technical specifications for the construction and operation of industrial handling and solidification / stabilization facilities to be established in Sile-Komurcuoda and planning of roads within the facility

  • Preparation of electrical, mechanical, architectural and structural application projects
  • Preparation of water, wastewater and infrastructure projects,
  • All project and process calculations
  • Preparation of estimate, BOQ and percentage calculations for each unit of the project
  • Preparation of specifications covering each material, manufacturing, tools, and equipment used in the projects
  • Preparation of general technical specifications for work execution.

Place:  Sile-Komurcuoda    
Customer: Istac Inc.
Work completion date: 2012
 

Diğer Projeler


İSTANBUL 3.HAVAALANI (IGA)  ATIKSU ARITMA SİSTEMLERİ  DANIŞMANLIK VE MÜŞAVİRLİK İŞİ

İSTANBUL 3.HAVAALANI (IGA) ATIKSU…

İstanbul 3. Havaalanı atıksu arıtma tesisinin yapımı sırasında, atıksu sistemleri konusunda danışmanlık…
İZMİR BÜYÜKŞEHİR BELEDİYESİ  SU VE KANALİZASYON İDARESİ GÜNEYBATI ATIKSU ARITMA TESİSİ KOKU GİDERİM TESİSİ

İZMİR BÜYÜKŞEHİR BELEDİYESİ SU VE…

İZSU İzmir Su ve Kanalizasyon İdaresi kontrolünde işletilen Güneybatı atıksu arıtma tesisinin kötü koku…
BURSA BÜYÜKŞEHİR BELEDİYESİ GEMİ ATIK KABUL TESİSİ

BURSA BÜYÜKŞEHİR BELEDİYESİ GEMİ…

Bursa ilinde yapılması planlanan Gemi Atık Kabul Tesisi fizibilite raporu ve projelerinin hazırlanması…
TAVŞANLI OSB ATIKSU ARITMA TESİSİ

TAVŞANLI OSB ATIKSU ARITMA TESİSİ

Tavşanlı OSB atıksu arıtma tesisinin tasarımı, fizibilite raporunun hazırlanması, ilgili Bakanlıklardan…