BOLU MUNICIPALITY WASTEWATER TREATMENT PLANT
BOLU MUNICIPALITY WASTEWATER TREATMENT PLANT
- 01 Ocak 2013
Scope of work:
Design of the wastewater treatment plant for the wastewater treatment in the service area of Bolu Municipality for year 2035, approval of the Ministry of Environment and Urbanization and construction (reinforced concrete + structural), mechanical, electric, road, infrastructure, drainage and landscape application projects
Location: Bolu
Customer: Bolu Municipality
Work completion date: 2013
Treatment Plant Units
- Pre-Treatment
- Coarse and Fine Grids
- Access Pump Station
- Ventilated Sand and Oil Holder
- Biological Treatment
- Anaerobic Pools
- Biological Nitrogen and Carbon Removal (Simultaneous Denitrification)
- Blower-Diffusers Ventilated Ventilation Pools
- Last precipitation
- Mud Treatment
- Sludge dewatering by centrifugation
Capacity and Flow:
Flow | 114.043 m3/day | |
---|---|---|
Parameter | Wastewater Input mg/l | Wastewater Output mg/l |
KOİ (mg/L) | 600 | 125 |
BOİ (mg/L) | 300 | 25 |
AKM (mg/L) | 180 | 40 |
TN (mg/L) | 60 | 10 |
TP (mg/L) | 8 | 1 |
pH | 6-9 | 6-9 |